Plastic bottle projects · Guangzhou, China

Give your product
the right form.

A clear, considered starting point for PET, HDPE, PETG and PP bottle sourcing. Bring your product brief; we will begin with material, capacity, closure and quantity.

Discuss a bottle project ↘
01PET · HDPE · PETG · PP
02MOQ FROM 5,000 PCS
03LEAD TIME CONFIRMED PER PROJECT
04FOB GUANGZHOU / SHENZHEN
01 / Materials

Start with what the package needs to do.

01 — PET

Clear &
lightweight.

Often considered when product visibility and a light, versatile bottle are part of the brief.

02 — HDPE

Durable &
practical.

A material to discuss for robust, opaque or natural-look packaging applications.

03 — PETG

Clarity with
presence.

A starting point for projects where a high-clarity, refined bottle appearance is important.

04 — PP

Light &
heat-tolerant.

Often used for caps, closures and bottles where heat resistance or a living hinge matters.

02 / Applications

Designed around how your product is held, filled and seen.

01

Personal care & beauty

Talk through bottle presence, dispensing preference and the visual role of a label or decoration.

02

Food & beverage

Begin with format, fill volume and the practical requirements of the intended product.

03

Home care & daily use

Consider handling, product use and shelf communication as part of one packaging brief.

03 / Formats

Bottles and jars we run most often.

04 / Process

Four steps, no surprises.

01

Brief

Capacity, quantity, formula, target price and market. A focused brief is faster than a catalogue request.

02

Options & quote

Three matching moulds with photos, MOQ and FOB price. A new mould, if needed, is quoted separately.

03

Samples

Samples are chargeable and freight is at your cost. The sample date is confirmed when the sample is quoted.

04

Production

Starts after approval. The date is fixed in the PI per project — longer for new moulds, colour matching or peak season.

Minimum order5,000 pcs per SKU
Production timeQuoted per project and fixed in the PI
SamplesChargeable; freight at buyer's cost
ToolingNo new mould needed with an existing stock mould; new moulds quoted separately
IncotermsFOB Guangzhou / Shenzhen; CIF quoted on request
05 / FAQ

The questions buyers ask first.

What is the minimum order quantity?

The minimum order is 5,000 pieces per SKU. For a first project we usually start with one stock mould and one colour, then add SKUs once the bottle is approved.

How long does production take?

Production time is confirmed per project, not fixed: it depends on the mould, the colour and the quantity. We put a firm date in the quotation and in the PI before you pay a deposit.

Are samples free?

Samples are chargeable, and the freight is at the buyer's cost. A sample is a physical proof of the mould, colour and print — it is quoted item by item.

Is tooling included?

Only when a stock mould already fits your bottle. If a new shape is needed, the mould is quoted separately and openly before we start.

Which materials do you work with?

PET, HDPE, PETG and PP. Other materials can be sourced for a specific project, but they are confirmed against the mould and your filling line before we quote.

Which markets do you ship to?

Bottles are quoted FOB Guangzhou or Shenzhen; freight and packing are quoted per project. We do not publish a flat shipping claim because ports, volume and packing change the number.

Start an enquiry

Put the right bottle on your next brief.

Send the material, capacity, intended application and expected quantity. PACKFORM is presented by Guangzhou Xiaobao Technology Co., Ltd., Huadu District, Guangzhou.

Email your project brief ↗ WhatsApp +86 159 9242 0001